Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/ecg/ecgassociationdev/wp-includes/functions.php on line 6121
Single Article - The Association of European Vehicle Logistics
Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /home/ecg/ecgassociationdev/wp-includes/formatting.php on line 3493

Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /home/ecg/ecgassociationdev/wp-includes/formatting.php on line 3493

Stena Line and Norsepower team-up on future-proof methanol hybrid RoRo equipped with Norsepower Rotor Sails™

Stena Line and Norsepower team-up on future-proof methanol hybrid RoRo equipped with Norsepower Rotor Sails™

Stena Line — 2025-03-18

Members Corner

Stena Line and Norsepower have signed an agreement for the delivery of two Norsepower Rotor Sails™ on an all-new methanol hybrid newbuild RoRo vessel Stena Connecta. The agreement is a step in Stena Line's goal to reduce its carbon dioxide emissions by 30 % by 2030.

Built by Jinling Weihai Shipyard in China, the 147-metre vessel will feature two 28x4m Norsepower Rotor Sails™ (NPRS), projected to deliver up to 9% fuel savings on the planned trade route. Scheduled for delivery to Stena Line from Stena RoRo in Q4 2025, the ship will operate on the Irish Sea, between Belfast and Heysham, where wind conditions are very favourable for wind assisted propulsion.

This collaboration highlights the convergence of two industry leaders, both committed to innovation and sustainability. As a forward-thinking player in the maritime industry, Stena is renowned for its rigorous specifications and high standards. Stena Line’s strategic ambition to transition to renewable fuels, including securing future e-methanol volumes, aligns seamlessly with Norsepower’s mission to drive decarbonisation through wind propulsion technology.

"We are honoured to work with Stena Line, a company that has consistently led the way in sustainable shipping innovation,” said Heikki Pöntynen, CEO of Norsepower. “This partnership underscores the reliability and quality of Norsepower’s products, as well as its alignment with Stena Line’s forward-thinking goals to cut CO2 emissions by 30% by 2030.”

Dennis Tetzlaff, Chief Operating Officer Fleet, at Stena Line said, “Stena Line recently launched our new ship, Stena Connecta, into the water and it will now be fitted out with two rotor sails. These sails will harness wind power to provide auxiliary propulsion to the vessel, therefore reducing fuel consumption and emissions. Innovations such as this are key to futureproofing our vessels and to reaching our emissions targets.

Stena Connecta represents a step forward in sustainable shipping, built to operate on methanol and is part of a broader initiative to integrate sustainable technologies. The sister vessel in the same series, Stena Futura, is being delivered “rotor sail ready,” further demonstrating Stena Line’s commitment to wind propulsion.

To minimise environmental impact during the project’s execution phase, the NPRS will be manufactured at Norsepower’s new production facility in Yancheng, China, and delivered directly to the shipyard. This approach reduces costs and emissions while exemplifying both companies’ dedication to sustainable operations.

Stena Line has a long history of embracing innovation, becoming the first ferry operator to run a vessel on methanol with the conversion of Stena Germanica in 2015. The addition of Norsepower Rotor Sails further solidifies its position as an industry leader in decarbonisation.


Deprecated: preg_match_all(): Passing null to parameter #2 ($subject) of type string is deprecated in /home/ecg/ecgassociationdev/wp-includes/media.php on line 1879

Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /home/ecg/ecgassociationdev/wp-includes/formatting.php on line 3493