Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/ecg/ecgassociationdev/wp-includes/functions.php on line 6121
Single Article - The Association of European Vehicle Logistics
Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /home/ecg/ecgassociationdev/wp-includes/formatting.php on line 3493

Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /home/ecg/ecgassociationdev/wp-includes/formatting.php on line 3493

Valenciaport participates in a European project to promote the use of renewable energy for self-consumption in the port

Valenciaport participates in a European project to promote the use of renewable energy for self-consumption in the port

Valenciaport — 2024-05-02

Members Corner

  • The Port Authority of València continues its commitment to innovation and renewable energies by joining the European initiative RENEWPORT
  • Within the framework of this initiative, the Port of València is installing innovative renewable energy generation systems for self-consumption

The European project RENEWPORT (Harnessing RENEWable energy potential for clean energy transition of MED PORTs) is already underway in the Valencian docks.  The participation of the Port Authority of València (PAV) consists of the installation of innovative renewable energy generation systems for self-consumption in the port of Valencia. These innovative systems use existing free surfaces in the port for their “energisation” through the installation of solar panels.

From this pilot test and once the results of the implementation of the installation are obtained, it will be possible to obtain the knowledge for the massive implementation of this technology both in the ports managed by the PAV and by the other ports participating in the RENEWPORT project, as well as other ports outside the Euro-Med environment.

The PAV’s budget for this project is €280,000 and will last until 2026.

The RENEWPORT consortium

The Port Authority of València is part of the RENEWPORT project together with other partners from Italy, France, Slovenia, Croatia, Montenegro, Albania and Greece. This project, whose first meeting was held on 26 January 2024, is funded by the European Union through its Interreg Euro-Med programme and has a budget of €2,995,300.

In addition to the Valenciaport Foundation, the PAV and the Autorità di Sistema Portuale del Mare Adriatico, 7 other entities participate in the RENEWPORT project: Autorità di Sistema Portuale del Mar Tirreno Settentrionale, Chambre de commerce et d’industrie du Var, Port of Koper, Port Authority of Rijeka, Port of BAR JSC, Durres Port Authority and Piraeus Port Authority.


Deprecated: preg_match_all(): Passing null to parameter #2 ($subject) of type string is deprecated in /home/ecg/ecgassociationdev/wp-includes/media.php on line 1879

Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /home/ecg/ecgassociationdev/wp-includes/formatting.php on line 3493